Magnetic Track Lighting Pre-Shipment Inspection Checklist for Bulk Orders
A bulk lighting order can contain the right number of cartons and still arrive with the wrong control version or missing corner connectors. Before dispatch, a magnetic track lighting inspection should compare the goods with the approved order, drawings and reference sample. Give the inspector an acceptance reference for each check, specify how the goods will be sampled and agree who will review unresolved findings before shipment.
Magnetic Track Lighting Inspection Checklist for Bulk Orders
Use the matrix below to prepare the inspection instructions. Enter the exact document revision and acceptance criteria before the visit. For a mixed order, identify which checks apply to rails, luminaires, power supplies and accessory kits.
|
Inspection area |
What to check |
Acceptance reference |
Evidence to record |
|
Model and quantity |
SKU, variant and quantity by order line |
Purchase order, fixture schedule and approved changes |
Labels, carton references and count results |
|
Rails and workmanship |
Length, profile, ends, visible damage and finish |
Approved drawing and appearance criteria |
Measurements, sample IDs and photos |
|
Fit and accessories |
Module seating, retention, joints, feeds and end caps |
Assembly instructions and accessory schedule |
Models used in the sample assembly and fit results |
|
Electrical identity |
Supply input and output, fixture ratings and control version |
Approved product and driver documents |
Label photos and configuration checked |
|
Operation and controls |
Switching, specified dimming and CCT functions where ordered |
Agreed test procedure and limits |
Test setup, results and any failures |
|
Optical checks |
Specified light output, CCT or CRI checks |
Agreed measurement method and tolerances |
Instrument, conditions, measured values and limits |
|
Packing and marking |
Protection, kit contents, labels and quantities |
Packing specification and packing list |
Carton IDs, contents and packing photos |
For each finding, make it possible to trace the evidence to the affected unit or carton. The inspector’s report should also show which planned checks were completed and which remain open. QIMA’s pre-shipment inspection service provides an example of inspections organized around specifications, sampling and a report. QIMA pre-shipment inspection
Agree the Inspection Scope Before the Visit
Prepare the approved order and reference sample
Send the purchase order, bill of materials, drawings, product specifications and approved changes together. Identify the reference sample and its approval record. For each fixture, specify the ordered wattage, optic, CCT, CRI, finish and control version. Include agreed dimensional tolerances and appearance criteria so an inspector can assess a scratch or a length measurement against a written requirement. Magnetic track lighting sample approval workflow
Review Sampo Product Certificates
Sampo’s product compliance documents include CE-RED Certificate of Conformity CTSL2620930621EZ, issued on October 12, 2026, and RoHS Certificate of Compliance CTSL2620930622CZ, issued on October 15, 2026, by CTSL Testing (Dongguan) Co., Ltd. Both identify Foshan Sampo Lighting & Electrical Co., Ltd. as applicant and manufacturer. The CE-RED certificate names S20-20DG as its main model, while the RoHS certificate names S20-24S and lists additional models. These documents provide model-specific third-party evidence for supplier qualification. Match the ordered configuration to the certificate’s model list and supporting reports when preparing the inspection file.
Define the lot and sampling plan
Record the quantities and batches available for inspection, including the production and packing status. Agree how samples will be selected across the lot and whether particular checks require a different sample size or full count. If the plan uses an acceptable quality limit (AQL), specify the lot size, inspection level, sampling scheme and defect classifications, together with the applicable acceptance and rejection numbers.
Arrange access to the cartons and equipment needed for the agreed checks. List any test the inspector cannot perform and the reason, such as an unavailable controller or missing measurement equipment. Assign an owner to each open item.
Check Rails, Modules and Accessories as a Matched System
Inspect rail dimensions and workmanship
Compare sampled rails with the approved drawing. Record overall length and the critical profile dimensions required by the inspection plan. Check ends and visible surfaces for damage, burrs, distortion and finish defects against the agreed criteria. Photograph the location of a defect as well as its detail, with the sample or carton ID visible. Use the drawing’s specified tolerance for dimensional decisions.
Verify fit and accessory completeness
Assemble a representative section using the rail, module, feed and connectors specified for that order. Check seating, retention and joint orientation according to the product instructions. Record the models in the assembly so the result can be traced to the combination tested.
Sampo’s S20 catalog lists S20-L1 as a flexible electrical connector and S20-L2 as a surface-mounted L connector. Where an approved corner assembly requires both, give each part its own quantity on the inspection sheet. Then compare the packed kit with that schedule. Sampo S20 magnetic track system
Verify Electrical and Lighting Functions Under Agreed Conditions
Match the power supply and control version
Compare the labels on sampled power supplies and fixtures with the approved configuration. Record input requirements, output voltage, rated capacity and the ordered control option. Identify the controller and connected load used for the functional test. Have qualified personnel assemble and energize the test setup under the manufacturer’s instructions and the agreed procedure.
For switching and dimming checks, define the actions and expected response in advance. Include CCT adjustment only where that function was ordered. Record the result for each sampled configuration and any failure to start, respond or operate consistently under the specified conditions.
Record functional and optical checks separately
If the order includes measured light output, CCT or CRI acceptance checks, agree the instrument, method, operating conditions and tolerance beforehand. Record both the measured result and the limit. Identify the fixture variant and test settings so the reader can compare like configurations.
Keep those measurements traceable alongside functional results. A missing measurement needs its own status and follow-up action in the report. Request the corresponding manufacturer test records where these form part of the agreed inspection package.
Check Packaging and Close Inspection Findings
Reconcile cartons and project kits
Review the protection around long rails, exposed ends, optical surfaces and loose accessories. Open the selected cartons and reconcile their contents with the packing list. For store-specific kits, check the destination label and quantity of each component, including separately packed feeds and end caps. SGS lists packing, markings, labels, batch numbers and packing lists among its cargo visual inspection checks.
Record defects, corrective actions and reinspection
Give each finding a reference and connect it to the affected SKU, batch, carton or sampled unit. State the requirement, observed result and defect classification under the agreed plan. Record the corrective action, responsible person and reinspection result.
The following hypothetical example shows how to document a missing accessory.
|
Record field |
Example entry |
|
Finding and location |
F-01, corner kit C-07, missing S20-L1 electrical connectors |
|
Requirement and result |
Approved kit schedule requires 12 connectors. Eight counted. Photos linked to C-07. |
|
Corrective action |
Supplier adds four connectors and checks other kits packed under the same process. |
|
Recheck evidence |
Recount confirms 12. Revised packing list and dated photos attached. Results for the other affected kits recorded. |
|
Decision |
Authorized reviewer records the decision for the affected scope after reviewing the recheck evidence. |
Agree the scope of any wider check when a finding could affect other cartons or batches. Keep the original magnetic track lighting inspection report with the corrective-action record so the buyer can follow what changed.
Frequently Asked Questions
Does every magnetic track light need to be inspected
Agree the inspection coverage by check and product group. The manufacturer may have production test records, while the buyer’s inspection plan specifies full counts, sampled appearance checks or tests on selected configurations. Record which units and batches were covered and request the production records required by the purchase agreement.
What if the approved sample passes but production units differ
Identify the affected models and batches, then document the difference against the sample record or specification. Ask the supplier to establish the affected scope and propose corrective action. Recheck the corrected goods under the agreed procedure and send the evidence to the person authorized to decide shipment release.
What should a pre-shipment inspection report include
Include the order and lot identity, production status, reference documents, sampling plan, test conditions and results. Attach measurements and photos linked to sample or carton IDs. List defects, unavailable checks, corrective actions and reinspection results, with the reviewer’s decision and any remaining actions clearly assigned.
Prepare Your Bulk Order for Inspection
Send the inspection party a coordinated package containing the PO, BOM, approved sample record, drawings, packing requirements and inspection plan. Include the report format and the person responsible for reviewing findings. Before booking a magnetic track lighting inspection for a Sampo order, confirm the checks, equipment and evidence that can be arranged for the specific configuration. Commercial lighting RFQ checklist · Contact Sampo about your bulk order